Dixie Valley
1980
Dixie Valley, NV
Terra Gen
Developed a hybrid cooling system with dry and wet cooling to increase generation in the summer months. Activites Performed: Led the conceptual design and feasibility study to refurbish the dry cooling tower system to a hybrid system to increase generation during the summer months. The results were positive. The developer was not able to secure the necessary water rights and the project was not constructed.
Stages:
2. Drilling Exploration
Stay in Touch