Mine Reclaim and Conveyor Circuit - Sand Plant Improvement
Project Highlights
- Designed and engineered the reclaim tunnel and conveyor
- Specified and selected all necessary equipment
Benefits (Engineering, Economics, & Environment)
Increased production rate from an actual 250 tons/hr to a design potential of 800 tons/hr. Actual operations have been running at 650 tons/hr on average.
ROI Analysis showed full payback in 6 months; however, once installed and operating, the actual payback time was only 4 months!
In eliminating the vehicular use to feed the sand plant, greenhouse gas (GHG) emissions were reduced by over 1,055 tons/yr and total power usage was reduced by 1,046 HP.