Planning, design, and permitting for the development of a 2,000 SCFM LFG-to-RNG Plant for transmission to a local natural gas pipeline for use across the regional distribution network. The plant is designed to process up to 2,000 SCFM of LFG at approximately 45-50 percent methane content. This plant is proposed to replace a former Landfill Gas to Energy (LFGTE) facility that has been offline for a few years.
Project Highlights
- Landfill Gas Conveyance and Controls Design
 - Land Development and Permitting
 - Geotechnical Investigation
 - Environmental Permitting
 - Air Permitting
 - Gas Delivery and Condensate Management Mechanical, Electrical, and SCADA Design
 - Mechanical Process Simulation
 - Facility Structural Design
 - Facility Mechanical, Electrical, Process Instrumentation Design
 
Benefits (Engineering, Economics, & Environment)
- Integrated LFG Beneficial Use project to replace offline LFGTE facility
 - Reduced GCCSÂ capital expenditures for the landfill by sharing these costs with the RNG Plant Operator
 - Helps the landfill meet their Sustainable Circular Economy and Greenhouse Gas (GHG) emissions reduction goals
 
		  
	